East Tennessee & Georgia

The road was reorganized from the Hiwassee Railroad in 1848 and completed in 1855 (through Dalton, Georgia). A better route, through Cleveland, opened in 1858.

The vast majority of the copper produced by the Confederacy entered the rail system at Cleveland. The loss of the road near Cleveland in 1863 caused a crisis in the Confederate armaments system and the closing down of the Ducktown, Tennessee copper mines.

Shortly before the loss of the connection to the Western & Atlantic RR in the Fall of 1863, the President and Superintendent removed all the rolling stock and shops to Georgia, using Augusta as a base of operations.

Black's Number 76 (map)
Track 148 miles of 5 foot gauge 64# T-rail
Locomotives 22; 23 names
Cars 171
Stations
22
Mouse Creek Station (Niota)
Officers Many
Tredegar Purchases All
Annual Reports
7-1-61 President
7-1-61 Superintendent
7-1-62 President
7-1-65 President
7-1-65 Superintendent
Significant Documents
NP, RD 2-13A-61
NP, FG 3-20-61
NP, REX 3-22-61
NA, QMR 5-30-61
NA, QM 6-5-61
NP, RD 6-18B-61
NP, RD 6-18C-61
NP, AC 7-4-61
NA, QM 7-10A-61
NA, QMR 7-11-61
NA, QMR 7-12C-61
NA, QM 7-13B-61
NA, QM 7-17A-61
NA, QM 7-17B-61
NA, QMR 7-19-61
NA, QMR 7-19A-61
NA, QMR 7-19B-61
NA, QMR 7-21A-61
NA, QM 7-29C-61
NA, QMR 7-29-61
NA, QMR 7-29A-61
NA, QM 7-30B-61
NA, QMR 7-31-61
NA, SWR 8-3-61
NA, QM 8-6-61
NA, QMR 8-6A-61
NP, AP 8-30-61
NA, QMR 9-1-61
OR Series 1, Vol. 52, Part 2, Page 139
NA, QMR 9-4D-61
NA, QMR 9-10A-61
NA, QMR 9-10C-61
NA, QMR 9-11A-61
NP, AP 9-13-61
NA, QMR 9-21A-61
NA, QMR 9-25C-61
NA, QMR 9-27A-61
UG, W&A 9-27-61
NA, RRB 10-4-61
NA, QM 10-10A-61
NP, KR 10-17-61
NA, QMR 10-18A-61
NP, RD 10-19-61
NA, QM 10-23B-61
NA, ET&G 10-29-61
NA, ET&G 10-29A-61
NA, QMR 10-29-61
NA, QMR 10-30-61
NA, QM 11-2A-61
OR Series 1, Vol. 4,  Page 231
OR Series 1, Vol. 4,  Page 232
NA, QM 11-10-61
OR Series 1, Vol. 4,  Page 235
NA, QM 11-11-61
NP, RD 11-11-61
NP, WJ 11-12-61
NA, ENG 11-13-61
NP, RD 11-13A-61
NP, RD 11-13C-61
LVA, TRED 11-13C-61
LVA, TRED 11-13D-61
NP, MAP 11-14-61
NP, REX 11-15-61
NP, MAP 11-16-61
NA, RR 11-17-61
NP, REX 11-19-61
NP, WTW 11-22B-61
NP, WTW 11-22C-61
NP, SW 11-27A-61
NP, RD 12-2B-61
NA, SWR 12-4-61
NA, QM 12-6-61
NA, RR 12-12A-61
OR Series 1, Vol. 7,  Page 768
NP, AC 1-1-62
NP, MAP 1-1-62
NA, ENG 1-5-62
NA, ET&G 1-7-62
NA, RR 1-9-62
NA, QM 1-10-62
NA, QM 1-10A-62
NA, QM 1-14B-62
NP, CGA 1-25-62
NA, QMR 2-3A-62
NA, QM 2-5-62
NP, CGA 2-6-62
NP, RD 2-18A-62
NP, AP 2-6-62
NP, MAR 3-10-62
NA, DET 3-24-62
NA, DET 3-31-62
NA, ET&G 4-x-62
NP, AP 5-2-62
NP, MAP 5-10-62
NA, DET 5-22-62
NA, QM 5-22-62
NP, AP 6-6-62
OR Series 1, Vol. 16, Part 2, Page 678
OR Series 1, Vol. 16, Part 2, Page 680
OR Series 1, Vol. 16, Part 2, Page 680A
OR Series 1, Vol. 16, Part 2, Page 699
NA, DET 6-22-62
NA, N&C 6-22-62
NA, DET 6-23-62
OR Series 1, Vol. 16, Part 2, Page 716
OR Series 1, Vol. 23, Part 2, Page 904
NA, RRB 8-7D-62
NA, RR 8-x-62
NP, CM 9-2-62
NP, AP 9-12-62
NA, QMR 9-26B-62
NA, RR 9-30-62
NA, QMR 10-16B-62
NA, DET 10-21-62
AHC, ETG 11-4-62
NP, AP 11-7-62
NP, CR 11-7-62
NP, SMN 11-7-62
NP, RR 11-8A-62
NP, GP 11-13-62
NP, CR 11-14-62
AHC, LPG 11-15-62
OR Series 1, Vol. 20, Part 2, Page 406
NA, ET&G 11-22-62
OR Series 1, Vol. 20, Part 2, Page 421
NP, ASCY 11-30B-62
NP, RD 12-12A-62
UG, ET&G 12-31-62
AHC, LPG 1-6B-63
NA, ENG 1-6A-63
NP, VW 1-24-63
GA,  W&A 1-30-63
NP, CR 2-8-63
D, ET&G 2-10-63
NP, AP 2-20-63
NP, AP 2-20A-63
NP, AP 2-27-63
NA, QMR 3-3B-63
D, ET&G 3-4-63
NP, MAP 3-4-63
NA, RR 3-14-63
NP, SW 3-18-63
NP, SW 3-25-63
NP, SW 3-25A-63
NP, DB 3-26-63
OR Series 1, Vol. 23, Part 2, Page 742
NA, QM 4-7-63
OR Series 4, Vol. 2, Page 483
OR Series 4, Vol. 2, Page 487
NP, AP 4-17-63
NA, QM 4-20A-63
NP, AP 4-24-63
NA, QM 5-1-63
NA, QMR 5-6-63
UG, RR 5-27-63
UG, RR 5-28-63
NA, QM 6-17-63
OR Series 1, Vol. 23, Part 2, Page 453
NP, ASCY 6-24-63
NA, DWV 6-25-63
UG, RR 6-26-63
AHC, LPG 6-30-63
NP, RR 7-1-63
UTN, ET&G 7-15-63
OR Series 1, Vol. 23, Part 2, Page 916A
NA, ENG 7-24-63
OR Series 1, Vol. 23, Part 2, Page 929
LVA, RRB 8-3-63
LVA, RRB 8-4B-63
NA, QMR 8-4B-63
LVA, RRB 8-6A-63
LVA, RRB 8-7A-63
AHC, LPG 8-15-63
NA, ENG 8-18-63
OR Series 1, Vol. 30, Part 4, Page 528
AL, TNRR 8-30-63
H, RRB 9-9A-63
NP, JR 9-10-63
NP, MT 9-11-63
NP, RD 9-12-63
NP, AI 9-13C-63
NP, RS 9-25-63
NA, G 10-15-63
NA, RR 10-17-63
OR Series 1, Vol. 31, Part 3, Page 596
NA, ENG 10-22-63
OR Series 1, Vol. 31, Part 3, Page 671
NA, ET&G 10-27-63
NA, ET&G 10-28-63
NA, L 11-5-63
NP, RS 11-9-63
OR Series 1, Vol. 31, Part 3, Page 680
OR Series 1, Vol. 31, Part 3, Page 686
OR Series 1, Vol. 31, Part 3, Page 686A
NA, ET&G 11-13-63
OR Series 1, Vol. 31, Part 3, Page 687
OR Series 1, Vol. 31, Part 3, Page 703
OR Series 1, Vol. 31, Part 3, Page 750
OR Series 1, Vol. 31, Part 3, Page 758
OR Series 1, Vol. 31, Part 3, Page 777
NA, ET&G 12-4-63
NA, MAXWELL 12-4B-63
OR Series 1, Vol. 51, Part 2, Page 574
RRBAT 12-17-1863
RRBAT 12-18-1863
NA, QMR 1-4B-64
RRBAT 1-14-1864
OR Series 1, Vol. 52, Part 2, Page 602A
NA, ET&G 1-21-64
NA, ET&G 1-23-64
OR Series 1, Vol. 32, Part 2, Page 612
NA, G 2-3-64
NA, ET&G 2-5-64
UG, ET&G 2-5-64
NA, ET&G 2-6-64
NA, ET&G 2-9-64
NA, ET&G 2-18-64
NA, ET&G 3-12-64
NA, ET&G 3-17-64
NA, ET&G 3-19-64
NA, ENG 3-28-64
NA, RRB 4-1A-64
AHC, LPG 4-4-64
NA, ET&G 4-22-64
NA, ET&G 4-26-64
NA, ET&G 4-27-64
NP, AC 7-12-64
OR Series 4, Vol. 3, Page 537
NA, QM 8-17-64
NA, QMR 9-7B-64
OR Series 1, Vol. 42, Part 3, Page 954
OR Series 3, Vol. 5,  Page 933

Home