Atlantic & Gulf

The road was chartered in 1856. Construction was completed to Valdosta in July of 1860. This road was operated by the Savannah, Albany & Gulf Railroad. The two roads merged in May 1863 under the Atlantic & Gulf Railroad name.
Black's Number 49 (map) (map)
Track 158 miles of 5 foot gauge of 56# rail of unknown type. 52# rail had been received for about 8 miles of new construction west of the last station.
Locomotives 0
Cars 0
Stations 0
Officers Most
Tredegar Purchases All
Annual Reports
2-1-61 President
2-1-61 Engineer
2-1-62 President
2-1-62 Engineer
2-1-63 President
2-1-63 Engineer
2-1-63 Superintendent
1-1-64 President
1-1-64 Superintendent
1-1-66 President
1-1-66 Engineer
1-1-66 Superintendent
Significant Documents
NP, MT 4-3-61
NP, SMN 9-30-61
NP, SRDR 10-22B-61
UG, RR 12-6-61
NA, SC 12-30-61
NA, A&G 2-5-62
NA, QMR 8-23-62
UG, A&G 1-20-63
NA, SWR 3-14-63
NA, SWR 3-16-63
AR, SA&G 4-18-63
NP, RS 5-28-63
NA, ENG 7-16-63
NA, ENG 7-16-63
OR Series 4, Vol. 2, Page 648
UG, A&G 8-19-63
NCA, RRB 9-2A-63
H, RRB 9-5C-63
H, RRB 9-8J-63
H, RRB 9-18-63
LVA, RRB 10-13-63
LVA, RRB 10-14-63
OR Series 1, Vol. 28, Part 2, Page 459
NA, RR 11-7-63
NA, CSN 11-9-63
NA, RRB 11-25A-63
NA, RR 12-26A-63
NA, SC 12-30A-63
NA, SC 12-30B-63
NP, SMN 12-31A-63
NA, CS 2-15-64
NA, ENG 2-22C-64
NA, A&G 3-24-64
NP, MAP 3-31A-64
UF, A&G 4-6-64
OR Series 1, Vol. 35, Part 2, Page 484
NA, A&G 6-6-64
UG, A&G 7-27-64
NA, A&G 8-1-64
NA, A&G 8-31-64
NP, SR 9-1-64
NA, A&G 9-20-64
NA, A&G 9-28-64
NA, A&G 9-30-64
NA, QMR 10-7C-64
NA, QM 12-5-64
NA, SWR 10-31-64
NA, A&G 12-8-64
NP, TAR 12-8-64
OR Series 4, Vol. 3, Page 1006
OR Series 1, Vol. 47, Part 2, Page 1021
NA, RRB 1-27-65
OR Series 4, Vol. 3, Page 1053
NA, RRB 2-3-65
OR Series 1, Vol. 47, Part 2, Page 1105
OR Series 3, Vol. 5,  Page 974

Home