|
Alabama & Florida
(of Alabama) |
| The road was chartered by Alabama
in 1850 to meet with the road of the same name that was chartered by
Florida. The intent was to connect the large cotton growing areas near Montgomery, Alabama
with Pensacola,
Florida. The entire line was completed in May 1861. |
| Black's Number |
57 (map) |
| Track |
116 miles of 5 foot gauge of strap, unknown weight |
| Locomotives |
11; 11 names |
| Cars |
81 |
| Stations |
10 |
| Officers |
Several |
| Soldier's Ticket |
Soldier's Ticket |
| Annual Reports |
|
| Tredegar Purchases |
All |
| Significant Documents |
| NP, MM 1-1-61 |
| NP, MDA 1-23-61 |
| NP, RD 4-5-61 |
| NP, CC 4-6-61 |
| NP, ASCY 4-18-61 |
| OR Series 1, Vol. 51, Part 2, Page 78 |
| NP, MT 5-1-61 |
| NP, RD
5-4B-61 |
| NP, RD
6-8B-61 |
| AOC, 8-22-61 |
| NA, QM 12-11C-61 |
| AL, ALRR 2-24-62 |
| OR Series 1, Vol. 7, Page 913 |
| NP, SMR 8-12-62 |
| LVA, RR 9-14-62 |
| OR Series 1, Vol. 17, Part 2, Page 900 |
| NP, MM 10-1-62 |
| AL, A&F 11-18-62 |
| AL, A&F 11-18A-62 |
| AL, A&F 11-18B-62 |
| NP, MM 11-18-62 |
| AL, A&F 11-23-62 |
| AL, A&F 11-25-62 |
| AL, A&F 11-25A-62 |
| NP, MM 11-28-62 |
| OR Series 1, Vol. 23, Part 2, Page 761 |
| NA, A&F
4-8-63 |
| OR Series 1, Vol. 6, Page 848 |
| OR Series 4, Vol. 2, Page 483 |
| OR Series 4, Vol. 2, Page 487 |
| NP, MA 5-9-63 |
| NA, QM 6-8A-63 |
| AL, A&F 6-30-63 |
| OR Series 1, Vol. 30, Part 4, Page 608 |
| MISC, A&F 8-12-63 |
| RRBAT 11-10A-1863 |
| NA, M&E 11-20-63 |
| NA,
RR 12-1-63 |
| NA,
A&F 12-31-63 |
| NA, A&F 1-x-64 |
| NP, MA 4-16-64 |
| AL, A&F 5-26-64 |
| AL, A&F 6-21-64 |
| OR Series 1, Vol. 39, Part 2, Page 702 |
| NA, QM 7-26C-64 |
| NP, AC 8-11A-64 |
| AL, A&F 9-3-64 |
| AL, A&F 9-28-64 |
| NA, QM 10-1-64 |
| AL, A&F 10-13-64 |
| AL, A&F 10-13A-64 |
| NA,
A&F 10-15-64 |
| NA,
A&F 10-22-64 |
| OR Series 1, Vol. 44, Part 1, Page 449 |
| NA, M&WP 12-31-64 |
| NP, AC 1-5-65 |
| D, A&F 2-6-65 |
| OR Series 1, Vol. 49, Part 1, Page 1023 |
| NP, RCF 3-31-65 |
| AR, A&F(FL) 5-1-67 S |
|